Update 29.0.202645.181901

Prev Next

Release Date: 4. November 2026

Release Summary


This update fixes Carry Out failing on multi-level Make-to-Order items, Simple MRP's per-variant calculation, and Move Demand Dates run per Low-Level Code — and lets planning templates each target their own company through a shared External Tenant connection.

Improvements


External Company Name for External Tenant connections

You can now set, per planning template, which company an External Tenant connection should use, since one connection can be shared by templates that target different companies. Use the new External Company Name field next to External Tenant Code on the Reverse Planning - Planning Template page, or next to Use External Tenant on the Overstock Items request page.

Why it matters: Existing planning templates are updated automatically to the company that was previously set on the connection, so no setup is needed after upgrading. Deleting a connection that a template still uses is now blocked, and renaming a connection updates the templates that use it automatically.

Edit Move Demand Days on the Move Demand Dates worksheet

You can now see and edit how many days a demand line is moved, in a new Move Demand Days field next to New Due date on the Reverse Planning - Move Demand Dates worksheet; entering a number of days updates New Due date, and changing New Due date updates Move Demand Days back. Carry-out only moves the parent orders when Move Demand Days is greater than zero, so clearing New Due date leaves the parent orders in place.

Bug Fixes


Carry Out no longer fails on multi-level Make-to-Order structures

Fixed an issue where carrying out a Simple MRP line for a Make-to-Order item whose bill of materials contained another Make-to-Order item failed with an error about not having enough space to insert lower-level lines; by default the item now gets a single worksheet line, and you can select Unfold Make-to-Order Items when using Simple MRP on the Reverse Planning - Setup page to add a separate line for each lower-level Make-to-Order component instead, as the standard planning worksheet does.

Simple MRP now calculates End Inventory separately for each variant

Fixed an issue where running Simple MRP with Calculate per Variant turned on calculated the first variant's End Inventory from the combined demand of every variant of the item, and could delete the existing journal and requisition lines of the other variants in the process. Applies when Calculate per Variant is turned on in the Reverse Planning - Planning Template and the calculation is run as a Reverse Planning - Simple MRP worksheet.

Why it matters: Getting a fully correct End Inventory for each variant also requires the related demand forecast fix released separately in Abakion App Manager Core.

Running Move Demand Dates one Low-Level Code at a time no longer deletes other levels

Fixed an issue where running Move Demand Dates one Low-Level Code at a time deleted the lines already calculated for the other levels, because the cleanup cleared the whole journal instead of just the item being recalculated. Applies when Run for all Low Level Codes is unchecked on the Reverse Planning - Planning Template, with results shown in the Reverse Planning - Move Demand Dates worksheet. The cleanup now also removes any of the item's older lines left behind in other journal batches, so re-running Move Demand Dates no longer leaves stale duplicates from earlier sessions.

Purchase Order Management actions on the Reverse Planning - Planning Worksheet

You can now use the Handle Journal, Handle Line, Handle Journal and send mail, and Handle Line and send mail actions on the Reverse Planning - Planning Worksheet, and each one now runs correctly every time you use it, including on repeated clicks. Requires the Purchase Order Management app; the two send-mail actions also require the Document Handling app.