--- title: "Update 29.0.202645.181901" slug: "update-29-0-202645-181901" description: "November 2026 Reverse Planning update fixes Simple MRP variants, Make-to-Order Carry Out, and Move Demand Dates while improving planning templates." updated: 2026-11-05T10:48:37Z published: 2026-11-05T10:48:37Z canonical: "docs.abakion.com/update-29-0-202645-181901" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.abakion.com/llms.txt > Use this file to discover all available pages before exploring further. # Update 29.0.202645.181901 Release Date: 4. November 2026 ## ![](https://cdn.document360.io/b53c92b4-6b2d-4730-b8fc-fa2e7b107470/Images/Documentation/Summary.svg) Release Summary This update fixes Carry Out failing on multi-level Make-to-Order items, Simple MRP's per-variant calculation, and Move Demand Dates run per Low-Level Code — and lets planning templates each target their own company through a shared External Tenant connection. ## ![](https://cdn.document360.io/b53c92b4-6b2d-4730-b8fc-fa2e7b107470/Images/Documentation/Improvement.svg) Improvements **External Company Name for External Tenant connections** You can now set, per planning template, which company an External Tenant connection should use, since one connection can be shared by templates that target different companies. Use the new **External Company Name** field next to **External Tenant Code** on the **Reverse Planning - Planning Template** page, or next to **Use External Tenant** on the **Overstock Items** request page. **Why it matters:** Existing planning templates are updated automatically to the company that was previously set on the connection, so no setup is needed after upgrading. Deleting a connection that a template still uses is now blocked, and renaming a connection updates the templates that use it automatically. **Edit Move Demand Days on the Move Demand Dates worksheet** You can now see and edit how many days a demand line is moved, in a new **Move Demand Days** field next to **New Due date** on the **Reverse Planning - Move Demand Dates** worksheet; entering a number of days updates **New Due date**, and changing **New Due date** updates **Move Demand Days** back. Carry-out only moves the parent orders when **Move Demand Days** is greater than zero, so clearing **New Due date** leaves the parent orders in place. ## ![](https://cdn.document360.io/b53c92b4-6b2d-4730-b8fc-fa2e7b107470/Images/Documentation/Group 7.svg) Bug Fixes **Carry Out no longer fails on multi-level Make-to-Order structures** Fixed an issue where carrying out a Simple MRP line for a Make-to-Order item whose bill of materials contained another Make-to-Order item failed with an error about not having enough space to insert lower-level lines; by default the item now gets a single worksheet line, and you can select **Unfold Make-to-Order Items when using Simple MRP** on the **Reverse Planning - Setup** page to add a separate line for each lower-level Make-to-Order component instead, as the standard planning worksheet does. **Simple MRP now calculates End Inventory separately for each variant** Fixed an issue where running Simple MRP with **Calculate per Variant** turned on calculated the first variant's End Inventory from the combined demand of every variant of the item, and could delete the existing journal and requisition lines of the other variants in the process. Applies when **Calculate per Variant** is turned on in the **Reverse Planning - Planning Template** and the calculation is run as a **Reverse Planning - Simple MRP** worksheet. **Why it matters:** Getting a fully correct End Inventory for each variant also requires the related demand forecast fix released separately in Abakion App Manager Core. **Running Move Demand Dates one Low-Level Code at a time no longer deletes other levels** Fixed an issue where running **Move Demand Dates** one **Low-Level Code** at a time deleted the lines already calculated for the other levels, because the cleanup cleared the whole journal instead of just the item being recalculated. Applies when **Run for all Low Level Codes** is unchecked on the **Reverse Planning - Planning Template**, with results shown in the **Reverse Planning - Move Demand Dates** worksheet. The cleanup now also removes any of the item's older lines left behind in other journal batches, so re-running Move Demand Dates no longer leaves stale duplicates from earlier sessions. **Purchase Order Management actions on the Reverse Planning - Planning Worksheet** You can now use the **Handle Journal**, **Handle Line**, **Handle Journal and send mail**, and **Handle Line and send mail** actions on the **Reverse Planning - Planning Worksheet**, and each one now runs correctly every time you use it, including on repeated clicks. Requires the Purchase Order Management app; the two send-mail actions also require the Document Handling app. ## Related - [Simple MRP](/simple-mrp-pre-28-4.md) - [Versions Before BC27.0](/versions-before-bc270-6.md) - [Simple MRP](/simple-mrp.md)