--- title: "Update 29.0.202645.181865" slug: "update-29-0-202645-181865" tags: ["Production Order Costs", "Zero Planned Quantity", "Divide By Zero Error"] updated: 2026-11-05T10:47:14Z published: 2026-11-05T10:47:14Z canonical: "docs.abakion.com/update-29-0-202645-181865" --- > ## Documentation Index > Fetch the complete documentation index at: https://docs.abakion.com/llms.txt > Use this file to discover all available pages before exploring further. # Update 29.0.202645.181865 Release Date: 4. November 2026 ## ![](https://cdn.document360.io/b53c92b4-6b2d-4730-b8fc-fa2e7b107470/Images/Documentation/Summary.svg) Release Summary Production order cost calculation now completes for lines with a zero planned quantity. This fixes a case that previously stopped the calculation once output had already been posted against such a line. ## ![](https://cdn.document360.io/b53c92b4-6b2d-4730-b8fc-fa2e7b107470/Images/Documentation/Group 7.svg) Bug Fixes **Production order cost calculation now completes for zero-quantity lines** Fixed an issue where running **Calculate Prod. Order Cost** on the **Prod. Order Cost Calculation** page stopped with a divide-by-zero error, when a production order line had a planned quantity of 0 and output had already been posted against it, with **Calculate Expected Cost from Actual Finished Quantity** enabled on the **Prod. Order Cost Setup** page. **Why it matters:** For these lines, the expected time is now the full setup time plus the run time multiplied by the actual output, instead of dividing the setup time across the (zero) planned quantity. All other lines calculate exactly as before.