Update 29.0.202645.181841

Prev Next

Release Date: 4. November 2026

Release Summary


Routing lines updated through ROB-EX now keep their description and use the correct cost calculation.

This release also opens the update to partner customizations that need to react to a work or machine center change.

Bug Fixes


Routing line descriptions and costs now stay correct when ROB-EX changes a resource

Fixed an issue where moving an operation to a different work or machine center from ROB-EX overwrote the routing line's description, dropped its second description line, and did not always calculate machine center cost by time, on the ROB-EX Routing Line Entries page.

Why it matters: If you have a customization that keeps unit of measure codes or descriptions unchanged when a work center changes on a routing line, it can now be wired to also apply to changes made through ROB-EX, which was not possible before.